Wuxi Xianglong Plastic Technology Co.,Ltd is one of the leading China evaporative closed cooling tower fill manufacturers,Website:http://www.xianglongmaoyi.com, welcome to wholesale cheap cooling tower fill types from our factory.
Quick Details
Condition: New
Cooling Type: Cross Flow
Material: PVC, PP,UPVC, pvc, pp, upvc
Place of Origin: Hebei, China (Mainland)
Brand Name: SINTA
Model Number: ST-01
Dimension(L*W*H): 1330mm*any length
Warranty: within 1 year
After-sales Service Provided: Overseas service center available
Item name: Evaporative closed cooling tower fill
type: cross-flow cooling tower fill
application: BAC fill for bac cooling tower
Fill size: 1330mm*any length
Fill Thickness: 0.35mm-0.55mm
Color: black
Application temperature: 75℃~-35℃
Packaging: by crate or as per customer's request
Sample: can be supplied freely
Packaging & Delivery
Packaging Details:
BAC cooling tower fill is packed by wooden case
Delivery Detail:
within 15 days after receiving the deposit
1300mm*any lenth Evaporative closed BAC cooling tower fill
Product Description
BAC Cooling Tower fill Features
-100% Virgin PVC material
-Good elastic character
-Improved water distribution
-High thermal performance
BAC Cooling Tower fill Introduction
BAC cooling Tower Fill is one of the most important components for exchange of gas and water in cooling tower. It is the major parts to improve the efficiency of cooling tower and make sure the economy and safe operation. With the development of the plastic industry, counter-current tower drench water plastic packing "S" shape ladder wave, obliquely wave, which has the heat dissipation ,good performance ,Ventilated small resistance, durable, based on the easy and other advantages, it is widely used in different types of large, medium, small, cooling tower.
BAC Cooling Tower fill Specification
Name
BAC Cooling Tower Fill sheet
Type
Cross flow cooling tower fill
Material
PVC, PP, UPVC
Size
1330mm*any length
Thickness
0.35mm-0.45mm
Application Temperature
-35℃- 75℃
Color
Black, grey, etc
Packaging Detail
BAC fill sheets are packed by wooden case
MOQ
500 pieces
Delivery period
Within 15 days after receiving the deposit
More photos of BAC cooling tower fill
Packaging & Shipping
MOQ
500 pieces
Packaging Detail
BAC fill sheets are packed by wooden case
Delivery period
Within 15 days after receiving the deposit
Advantage
Our company cooling tower have advantage as below
1.New material
2.large plastic extrusion
3.long service life
4. high temperature resistant
5. Good heat exchange perfomance, and excellent Cooling efficiency
Other hot sales