Flat Pack Container House Standard Size Specification Dimension of Flat Pack Container HouseLengthWidthHeightStandard 20HCExternal Size6058mm2438mm2791/2896Internal size5878mm2258mm2445/2550Project 20HCExternal Size6058mm3000mm2791/2896Internal size5878mm2820mm2445/2550Speciality Application:1.Factory workshop,Website:http://www.shyingtang.net, maximum can mount 3floors 2.Garden or park administration center. Construction capasite,army camp, warehouse etc. Product Details Floor Steel frame : 3mm thick cold rolled & welded steel profiles; welded 4 corner castings with dimensions according with ISO norms.Insulation Thickness: 100mm mineral wool/Fiber-glass / PUSubfloor board: 0.5mm thick, galvanized steel sheet Floor Board: 18mm fiber cement board (water resistant v 100) complies with the emission value E1; free of formaldehyde (E1)Parallel compressive strength = 35.7 MPa; Formaldehyde emission ≤ 0.4mg/100g; 1.8mm thick synthetic PVC sheet floor covering, welded seams, water soluble adhesive,Flammability class B1 – hardly combustible; Smoke density class Q1 – low smoke emission; Welded seams. Roof Steel frame: 4mm thick cold rolled & welded steel profiles; welded 4 corners casting with dimensions according to ISO norms, steel purlin. Roof covering/interior: 0.4mm galvanized painting steel both side and polystyrene foaming 60mm in the middle, Insulation: 60mm polystyrene (density 38-40kg/ m3. To avoid cold bridges.Load capacity: 2,000N/m2K-value: 0.18W/m2kInsulation Thickness:Ceiling Panels: 100mm 9mm white chipboard(V20), 50mm 50mm Steel Sandwich panel100mm 12.7mm Glass Magnesium Board(Option2) Fiber cement floor: Density: 1.26kg/m3 K= 0.18W/m*k; Waterproof moisture content = 0.13%/m2 Formaldehyde emission = 0.2 mg/ 100g; Deformation, parallel to the bending elasticity = 6055MPa 18mm thick marine grade floor Parallel compressive strength = 88MPa; Formaldehyde emission ≤ 0.4mg/100g; Deformation, parallel to the bending elasticity = 8030MPa; Waterproof, moisture content = 6.0%/m2 Corner Posts :3/4mm thick cold rolled & welded steel profiles; Screwed to the floor base frame and roof frame. or 3mm thick cold rolled & welded steel profiles; Screwed to the floor and roof frame.Wall panelsExterior Cladding: 0.5mm thick corrugated or flat galvanized coated steel sheet Insulation: 60mm, 70mm, 80mm, 100mm mineral wool/glass wool/PU foamInternal Cladding:Laminated E1–Emission Valued 9mm thick chipboard; Parallel compressive strength = 18.1 MPa; Formaldehyde emission ≤ 0.1mg/100g; Water expansion ratio = 0.2% Low smoke and non- flammable Flammability class A1,non-combustible Smoke density: low smoke emission0.5mm thick galvanized and coated color steel sheet PAINTING/COATINGAll steel profile will be hot dipped galvanized(45μm)Epoxy zinc primer: min40 micronsPolystyrene coating: min50 micronsTotal coating: D.F.T: Min 90 micronsEXTERIOR DOORSAluminium alloy-door with blind, 870/2040 mm.WINDOWSDimensions: 960mm high*1200 mm wideThe windows are build with PVC materials and fitted with AluminumRolling Shutter. They are equipped with a blinding system and an insect net.ELECTRICAL INSTALLATION:Protection: Protective current switch(40/4E-0.03A), automatic fuses(B-characteristics) of suitable power(10A,16A)Earthing: 1 galvanised strip iron earth electrode(2.5*4mm) with fastening. The buyer/lessee to arrange for the lightning Earth installation on site.Equipment:support two 220V fluorescent fixed in the ceiling support one low noise 220V fan fixed in the wall.Open hole and frame for assembly for air-condition in the future.Others equipment will be fixed by the owner according his requirement such as switch, sockets, networks ware socket, phone socket, and phone will be connected by the owner. Phone wiring providing for easy go through the line. SITING AND ERECTION Any individual container should always be mounted on either wooden or concrete foundation bearers (6 bearers) The same applies to the combining of several CILC Module-Containers in a cluster where units must be positioned over concrete bearers or concrete slabs. Foundation parameters and frost depths would be subject to local demands and soil conditions. Level foundations are necessary for problem-free positioning and friction-free erection of any combination. For assembling please read the appropriate mounting instructions.Packaging & DeliveryPackaging:4 units module-container can be stacked as a ISO container, for easy To transports and moving for shipment. Very overhead rope,for SOC - container lift for handling.PACKING & TRANSPORTATION & INSTALLATION: