PostYou are now at: Home » Products » Machinery » Agricultural Machinery »

Walking Piling Frame

Click image to view original image
Price: Negotiable
Min.Order:
Supply
Delivery: Shipment within 3 days since the date of payment
Address: China
Valid until: Never Expire
Updated on: 2016-05-16 10:10
Hits: 453417
Enquiry
Company Detail
 
 
Details
The walking pile frameThe series CFG driller is a new kind of drillers.It is jointly developed by the Construction Machinery Comprehensive Research Institute and our company with advanced new technologies.The CFG series and its construction process has been nominated to a new state-level-construction process.The series CFG consists of two parts,Website:http://www.zzpiling.com,the pile-driving frame and the drilling system .Pile-driving frame adopts the series JZL track-type or the series JZB step-type walk,which makes movements flexible and repositionning rapid.The rotary head device adopts the national patent techniquetri-circle speed reducer which features high bearing capacity and reliability.Equipped with swivel joints, the output axis and the auger stem are hollow inside,which allows long spiral processing and super-fluidity construction.Feature of the pile-driving frame♦JZB series pile frame are safe,efficient,reliable piling machinery.♦Three-point support and two-direction adjustment of leader optimize piling verticality.♦Simple operation.All control system are in the control box.♦A variety of construction menthods can be realized by modular combination,such as SMW,CFG.Also could suspend vibratory hammer and diesel hammer.♦It is driven by electric motor,low noise,no exhaust emission and eco-friendly;suitable for urban constructionDuring operation,no vibration,noise or pollution arises,which brings a high rate.The CFG series is the ideal equipment for civil and industrial construction.Technical Parameter of walking pile-driving frameModelJZB50JZB90JZB120JZB200Height pf Mast25m31m35m40mMast supporting mode3-point supporting typeMast inclinationForward 9°Backward 5°Forward 9°Backward 5°Forward 9°Backward 5°Forward 9°Backward 3°Travel modeWalking-typeTravel speed4.8m/min3.38m/min3.38m/min2.39m/minSuperstructure slewing radius2.8m3.5m3.5m4.15mSuperstructure slewing speed0.4r/min0.32r/min0.28r/min0-0.59r/minSuperstructure slewing angle±180Outside dimension9.6×4×26.6m³11.3×5.4×32m³13×6.1×37m³14.15×7×42.5m³Max.Extraction Force250KN350KN500KN700KNTotal weight28T45T55T90TModel of long screw drill machineCFG20CFG25CFG30CFG35Model of vibro hammerDZ60ADZ90ADZ120ADZJ200Packaging & ShippingDelivery it without package and some parts should be packaged in wooden case.And it's better to delivery it in bulk ship.Working caseJZB120 walking pile-driving frame with CFG30 works on large tank project in Iraq.The second set of JZB120 walking pile-driving frame with CFG30 works on large tank project in Iraq.JZB120 walking pile-driving frame with vibro hammer works on highway in Vietnam.JZB120 walking pile-driving frame with DZ120KSA dual motor vibro hammer works in China.JZB90 walking pile-driving frame with CFG25 works in China.JZB120 walking pile-driving frame works in China.
Total: 0 [Show All]  Related Reviews
 
More »Our Others Products

[ ProductsSearch ]  [ Add To Favourite ]  [ Tell Friends ]  [ Print Content ]  [ Violation Report ]  [ Close Window ]