Description of container hotelContainer house can be combined together to make a container hotelFeatures of container hotel:Wind resistance210km/hEarthquake resistancegrade 8Live load capacity of roofing0.5kN/m2External and internal wall heat transmission coefficient0.35Kcal/m2hcUsageoffices, dormitory, hotel, remote building site, portable toilet and etc.Characteristics of container hotel1. Environment protective 2. Safe, Low cost, easy to installation3. Flexible fixing4. Light weight5. ISO 9001&CE certificate.6. No base work involved7. Environment protective, no garbage caused8. Doors, windows, and interior partitions can be flexibly fixed9. Beautiful appearance, different colors for the wall and roof10. Cost saving and transportation convenient11. Anti-rust and normally more than 15 years using life12.Safe and stable can stand 8 grade earthquakesMaterial lists of container hotelname Container hotellength 5850mmWidth 2438mmheight 2591mmSteel frame Material:Q345 steel:thickness 3-4mm Floor support:3mm thickness steel tube Surface working:sand blasting,epoxy basic painting 55mm, Final vinyl acrylic painting 55mm thick Forklift opening:size 100*250,distance is 1200mmRoof Outside steel:1.2mm steel sheet kneel:2mm thickness steel purlin Insulation:80mm thickness fiber glass Ceiling:8mm thickness OSB board pvc ceilingFloor Floor bottom board:0.4mm thickness steel sheet Keel:2mm thickness steel purlin Insulation layer:100mm thickness fiber glass Plywood+1.5mm floor leatherWall Wall panel:75mm thickness sandwich panel (alternative insulation material:PU,EPS,rock wool)Electricity system Double tube fluorescent light(usually 2pcs) Distribution board: 1pcs Socket:16A(usually 2pcs) Electric wire:three color wiring voltage:110-220v,50-60hzTechnical parameter House load:bearing max load capacity 2.0kn/m2(200kg/m2) Wind load:210km/h Compression capability loading:150kg/m2Container hotel room designLiving 20ft container house with one room and bathroom20ft container homes with two rooms and bathroom20ft container houses with kitchen and bathroomInstallation of container hotelPacking & Delivery of container hotelPackaging Details:1.steel structure: plastic film packing 2. panel: plastic film & cartoon packing 3. hardware: cartoon box packing4.one 40HQ container can load 6-7 unitsDelivery Detail:10-45 days after receive your prepaymentFAQ1. How to buy your ideal products?A: TT and L/C are acceptable and TT will be more appreciated. 50% deposit before producing, 50% balance before loading by TT.2. What is the delivery time?A: It depends on order quantities. Generally speaking, the delivery time will be within 15 to 40 days.3. How to pack the products?A: We use standard package. If you have special package requirements, we will pack as required, but the fees will be paid by customers.4. How to install after the goods arriving destination?A: We will provide detailed illustrations to you. If it is necessary, we will send technicians to help you. However, the visa fee, air tickets, accommodation, wages will be paid by buyers.