Quick Information
- Brand Name:WZH
- Place of Origin:China
- Model Number :02
Description
Prefab Light Steel Villa House
Light steel frame villa house is our main product, mainly used for houses,home, family, resort, holiday, hotel, hospital and other long life span residential buildings.
Steel frame prefabricated houses are constructed by an industrialized production mode, of which partial or all the components are prefabricated in a factory. The prefabricated components are then transported to the construction site and assembled by a reliable connection method. It is also called industrial residence or industrialized residence.
Assemble Process
SPECIFICATIONS OF the LGF +PREFABRICATED HOUSE | ||
I frame | Steel column | Q235 steel 80 * 80 * 2.5 square tube |
Steel beam | Q235 steel 80 * 80 * 2.5 square tube | |
Roof beam | Q235 steel 80 * 80 * 2.5 square tube | |
purline | Q550 Grade Steel C89*41*11*0.8 Cold-formed C steel Z275g/m2 | |
II Enclosure | Exterior wall | Decoration, 107 glue with Cement mortar, anti-cracking mortar, Wire mesh + mesh fabric, eps cement board and other material |
Interior wall | Decoration, anti-cracking mortar, grid cloth, eps cement board ans so on | |
waterproof interior wall | wire, decoration and so on | |
III Ground Floor | Regular Floor | Decoration, Cement mortar, SBS waterproof roll an so on |
waterproof floor | Decoration, Cement mortar.107Glue, Water waterproof A+B, SBS water proof roll and so on | |
IV,Roof | Roof | Decoration, SBS waterproof rolling, MGO board or OSB board, Glass wool coil |
V Canopy | Regular Ceiling | Ceiling keel, Sound insulation membrane, gypsum board, decoration and other material |
Waterproof celling | PE moistureproof film, Ceiling keel, PVC celling or other material | |
VI Door and Window | Outside door | Guard against theft or Glass door |
inner door | Wooden door or other glass door | |
Bathroom/kitchen door | Titanium magnesium alloy door | |
window | Aluminum alloy hollow Windows or other material |
Main Features
1.Energy-Saving & Enviromental protection.
2.High prefabricated capability, building a house like making a car.
3.Low self-weight and material saving.
4.Safe and durable.
5.Comfortable living.
6.Perfect joint and complete facility.
Price
- Delivery Port :According to customer requirements
Packaging & Delivery
- Packing :According to customer requirements
- Delivery Lead Time :25 days
- Supply Ability :8000 M2/month