PostYou are now at: Home » Products » Machinery » Construction Machinery »

High Quality Gypsum Board Production Line Equipment

Click image to view original image
Brand: Wuxing
Price: 5000000.00USD/Set
Min.Order: 1 Set
Supply 15 Set
Delivery: Shipment within 60 days since the date of payment
Address: China
Valid until: Never Expire
Updated on: 2019-06-21 09:20
Hits: 34373
Buy
Company Detail
 
 
Details

Introduction of the Equipment
 

Gypsum board production line based configuration table
Annual production(㎡) Plant area(㎡) Drying method Total installed capacity Productin linespeed
(m/min)
Requird workers Electrical configuration
1.5 million 60m×26m Thermal oil 116kw 3.0 8 Siemens
2million 70m×26m Thermal oil 127kw 4.2 10 Siemens
3million 84m×30m Thermal oil 166kw 6.25 11 Siemens
4million 110m×30m Thermaloil/Hot stove 210kw 8 11 Siemens
5million 112m×30m Thermaloil/Hot stove 234kw 10.5 11 Siemens
6million 122m×30m Thermaloil/Hot stove 240kw 12.5 11 Siemens
8million 136m×30m Thermaloil/Hot stove 349kw 16.5 11 Siemens
10million 150m×30m Thermaloil/Hot stove 467kw 20 12 Siemens
12million 172m×30m Thermaloil/Hot stove 488kw 24 13 Siemens
15million 204m×36m Thermaloil/Hot stove 578kw 31 15 Siemens
20million 240m×40m Thermaloil/Hot stove 778kw 40 15 Siemens
Product specifications: length 2400—3000mm width 1200—1220mm thickness 8—15mm






Gypsum board production line is the current production of new special equipment for decorative materials, the main work processes include:

1. The plaster and water and various additives, respectively, by automatic metering, automatic delivery system into the mixer, mixing into a gypsum slurry, and evenly sprinkled in the continuous forward movement of the face paper;

2. In the continuous forward while vibrating, the slurry gradually spread evenly, then into the extrusion molding machine and the upper and lower face paper complex, by the extrusion molding pulp is completely covered by the upper and lower skin paper, and extruded into Continuous slurry gypsum board;

3. The board in the molding line during the operation after shaping, natural solidification, automatic cutting, etc. have been gradually formed wet solid gypsum board, wet board by the program-controlled system, through the roller, belt conveyor and flap quickly into the drying room;

4. The board in the drying room under the strict control of each temperature zone, and into the hot air at different temperatures, wet plate evaporation, starch reaction and the board bonded to the protective paper, dried gypsum board from the drying room stand out;

5. And then flap again and pieces (front-facing), the length of the saw will cut the board into a certain size of the finished board;

6. The final delivery to automatic head and automatic stacking, palletizing completed by the forklift truck to the finished product warehouse.
 





Total: 0 [Show All]  Related Reviews
 
More »Our Others Products

[ ProductsSearch ]  [ Add To Favourite ]  [ Tell Friends ]  [ Print Content ]  [ Violation Report ]  [ Close Window ]