PostYou are now at: Home » Products » Transportation » Roadway Facility »

Thermoplastic Road Marking Paint

Click image to view original image
Brand: DAYU
Price: Negotiable
Min.Order:
Supply
Delivery: Shipment within 3 days since the date of payment
Address: China
Valid until: Never Expire
Updated on: 2012-05-11 17:25
Hits: 2902668
Enquiry
Company Detail
 
 
Details

Thermoplastic Road Marking Paint

Thermoplastic Road Marking Paint is made from petroleum resin, PE wax, pigment fillings, and it is powder form in room temperature. When heated up to 180-200, it is liquid state, and will form hard film after coated to road surface.

 

 



View Full-Size Image


Zhengzhou Dayu Machinery Co., Ltd. is a leading road marking machine manufacturer in China, was established in September 1992. Headquarters is located at Zhengzhou, Henan Province, China. Covering above 18, 000 square meters and registering capital of RMB 50 million.

Dayu business scope includes range: Road Marking Machine, Road Marking Pre-heater, Road Marking Paint, Road Marking Remover. Dayu supply road marking equipments base on ISO9001, ISO14001 management systems, and are CE, GOST certified.

The following is the characteristic of Thermoplastic Road Marking Paint:

1. Strong adhesive force: Special rubber elastomer is added into the paint to strengthen its adhesive force.

2. Anti-cracking property: Thermoplastic marking will be out of shape due to temperature variation, and materials with good weather ability is added into the paint to avoid cracking.

3. Bight in color:  Adopt excellent coated pigment, reasonable matching, good weather ability, and no color fading after long exposure.

4. High spreading: Low density, large volume, high spreading is the biggest characteristic.

Attention:

1. When construction, road surface must be clean and dry, and the temperature should be above 0.

2. When the paint is melted, the temperature should be controlled 180-200, and be discharged after well-mixiing.

3. The primer should be fully processed, and coat the markings after the primer is dry thoroughly.

4. For new concrete road, please start construction after three months or do some special treatment.

Total: 0 [Show All]  Related Reviews
 
More »Our Others Products

[ ProductsSearch ]  [ Add To Favourite ]  [ Tell Friends ]  [ Print Content ]  [ Violation Report ]  [ Close Window ]