WHEELED HYDRAULIC INVERTING BRIDGE FORMWORK STRUCTURE
Wheeled hydraulic inverting bridge formwork consists of seven parts: front axle, main bridge, rear axle, front bracket, rear bracket, travel drive and walking bracket.
effect
Wheeled hydraulic inverting bridge formwork The concrete construction under the front approach bridge allows the vehicle to pass through the trestle bridge to the lower step from the filling layer, perfectly matching the concrete construction of the inverting arch (floor) under various step method excavation methods to achieve early closure. Construction requirements for early ring formation.
ADVANTAGE
- The span of the trestle bridge is large, and it can meet the one-time concrete pouring of the inverted arch of 12 meters and 24 meters, which greatly improves the speed of the invert arch construction......https://www.gf-bridge-tunnel.com/products/hydraulic-inverting-bridge-formwork/wheeled-hydraulic-inverting-bridge-formwork/