Alloy 718 UNS N07718 Nickel Alloy Welded Pipe Petroleum/Power
GENERAL CHARACTERISTICS OF Alloy 718
Alloy 718 is a nickel-based precipitation-hardening alloy designed for very high yield strength, tensile strength and creep rupture properties at temperatures up to 1300ºF (705ºC.) The alloy has excellent weldability.
Production Name | Nickel Alloy Steel Pipes |
Standard | ASME/ANSI B16.9, ISO, JIS, DIN, BS,GB, SH, HG,QOST,ETC. |
Size | 1/2’’~48’’(Seamless);16’’~72’’(Welded) |
Wall thickness | Sch5~Sch160XXS |
Manufacturing process | Push, Press, Forge, Cast, etc. |
Nickel alloy steel |
Alloy 200/Nickel 200/NO2200/2.4066/ASTM B366 WPN; Alloy 201/Nickel 201/NO2201/2.4068/ASTM B366 WPNL; Alloy 400/Monel 400/NO4400/NS111/2.4360/ASTM B366 WPNC; Alloy K-500/Monel K-500/NO5500/2.475; Alloy 600/Inconel 600/NO6600/NS333/2.4816; Alloy 601/Inconel 601/NO6001/2.4851; Alloy 625/Inconel 625/NO6625/NS336/2.4856; Alloy 718/Inconel 718/NO7718/GH169/GH4169/2.4668; Alloy 800/Incoloy 800/NO8800/1.4876; Alloy 800H/Incoloy 800H/NO8810/1.4958; Alloy 800HT/Incoloy 800HT/NO8811/1.4959; Alloy 825/Incoloy 825/NO8825/2.4858/NS142; Alloy 925/Incoloy 925/NO9925; Hastelloy C/Alloy C/NO6003/2.4869/NS333; Alloy C-276/Hastelloy C-276/N10276/2.4819; Alloy C-4/Hastelloy C-4/NO6455/NS335/2.4610; Alloy C-22/Hastelloy C-22/NO6022/2.4602; Alloy C-2000/Hastelloy C-2000/NO6200/2.4675; Alloy B/Hastelloy B/NS321/N10001; Alloy B-2/Hastelloy B-2/N10665/NS322/2.4617; Alloy B-3/Hastelloy B-3/N10675/2.4600; Alloy X/Hastelloy X/NO6002/2.4665; Alloy G-30/Hastelloy G-30/NO6030/2.4603; Alloy X-750/Inconel X-750/NO7750/GH145/2.4669; Alloy 20/Carpenter 20Cb3/NO8020/NS312/2.4660; Alloy 31/NO8031/1.4562; Alloy 901/NO9901/1.4898; Incoloy 25-6Mo/NO8926/1.4529/Incoloy 926/Alloy 926; Inconel 783/UNS R30783; NAS 254NM/NO8367; Monel 30C Nimonic 80A/Nickel Alloy 80a/UNS N07080/NA20/2.4631/2.4952 Nimonic 263/NO7263 Nimonic 90/UNS NO7090; Incoloy 907/GH907; Nitronic 60/Alloy 218/UNS S21800 |
Package | Wooden cases, pallets, nylon bags or according to the customers' requirements |
Delivery time | 10-100 days depending on quantity |
Payment terms | T/T or Western Union or LC |
Shipment | FOB Tianjin/Shanghai, CFR, CIF, etc |
Application | Petroleum/Power/Chemical/Construction/Gas/metallurgy/Shipbuilding etc |
Remarks | Other materials and drawings are available. |
The third party inspection: | BV,SGS,LOIYD,TUV,and other party alloyed by clients. |