1. Installation procedure
1, the machine should be placed on the concrete ground smoothly, the machine can not swing phenomenon;
2. Open the sealing cover of the refueling port at the top of the oil tank, and then add No. 68 or No. 46 anti-wear hydraulic oil into the oil tank. The refueling height is: 100mm high from the oil tank item, and then cover the oil tank well (Note: when using the single cylinder baler, butter should be added on the left and right attached rods);
3. The industrial voltage and frequency of this machine are: 3N-380V-50HZ (export according to the local national voltage and frequency custom), three-phase four-wire system, three live wire connected to the wiring port inside the electric box, a neutral wire connected to the port, after the electric connection, the total power switch on, the switch inside the electric box closed, you can test the machine, check the motor steering after power, reverse will not press down, You need to switch the two power lines before you can try the machine.
4, the machine adopts electro-hydraulic control: according to the control box above the button icon to operate the machine;
5, if the machine tries well, the pressure plate can be normal up and down; Box can be normal up, down; More back and forth operation several times, the oil tank and oil pipe inside the air discharge, in the items into the box for compression packaging;
6, when playing a bag to bind, the pressure plate to the following can not be pressed down; The box is raised in the bundle, when the bundle is lifted in the press plate to take out the package block, under the box to the bottom of the next packaging;
7. When the machine is not in use for a long time, the pressure plate will rise to the top, the switch inside the electric box is disconnected, and then turn off the total power supply.
8, operation does not understand the telephone contact.