Power Module Board Electronics Manufacturing - Electronics Assembly China

Click image to view original image
Brand: Grande
size: OEM
color: OEM
Price: 1.00USD/pcs
Min.Order: 1 pcs
Supply 100000000 pcs
Delivery: Shipment within 15 days since the date of payment
Address: China
Valid until: Never Expire
Updated on: 2023-03-01 16:39
Hits: 43702
Buy
Company Detail
 
 
Details

[Description]
1, Turnkey solution for Power Module Board Electronics Manufacturing - Electronics Assembly China
2, PCB Assembly, PCB fabrication / PCB layout, PCB Reversing.
3,  Full Bespoke PCBA/ OEM/ EMS(Electronics Manufacturing Services).
4, SMT&DIP&PTH&BGA.
5, Components Sourcing.
6, Quick PCBA prototype.
7, X-ray test, ICT and Functional Circuit Test.
8, Sample and small batch order are accepted.

PCbaservice
Customer offers: Gerber file, PCB Specification, BOM and Assembly Drawing.
Full-turnkey PCBA: 1-30Layers PCB, Components Sourcing, SMT, PCBA testing, PCBA Aging test, PCBA Packing and PCBA Shipping.

PCBA Quality Assurance
1, Certifications: UL, SGS, TUV, BV, ROHS, ISO9001: 2008, TS16949: 2008 
2, 7 lines dust-proof SMT lines and DIP lines.
3, All line works wear anti-static and dust-proof clothing.
4, All operators should pass strictly training before they start work.
5, SMT Equipment:solder paste printer in Jidakang,, Mounter in Panasonic, Re-flow, Wave Soldering, Semi-auto DIP
6, PCBA Test Equipment: ORT, Constant temperature and humidity chamber,3D CMM,X-Ray.
7, PCBA Test:ICT, Functional Circuit Test and X-ray test.
8, Package Processed:
0402, 0603, 0805, 1206, 1608, 2125, 3216
Micro QFP 0.2mm
Flip-chip, BGA, Connectors
BGA Ball Pitch=0.2mm
9, Each workstation in accordance with the SOP 
10, Materials:FR-4, FPC, Aluminum,High TG,Halogen-Free, HF, CEM-1, CEM-3, FR-1, 94-V0 and so on.
11, Material Brand:KB, SHENGYI, NANYA and so on. 

PCBA Lead Time
PCBA prototype: 7-10 working days after contract signed and EQ /confirm/ied. 
Mass production: partial delivery according to the customer’s requirement.

Other information for PCBA
1, The mass production will be arranged after PCBA prototype /confirm/ied. 
2, Use Teflon adhesive tape to protect Mount Holes and GND Holes.
3, EPE is used to avoid impact and crash.
PCBA Standard Packing
Anti-static bag and compartmental packing

 

www.grande-pcba.com/news/

Total: 0 [Show All]  Related Reviews
 
More »Our Others Products

[ ProductsSearch ]  [ Add To Favourite ]  [ Tell Friends ]  [ Print Content ]  [ Violation Report ]  [ Close Window ]