Fully Hydraulic Power Unit Drilling Machine KT5000 Ore exploration machine
Is a new product developed by our company in 2006. Its main technical parameters are as shown in the table below.
Main Technical Parameter
Drilling Diameter(M) |
5 |
Drilling Depth(m) |
120 |
Rotation of Power Unit(r/Min) |
0-12 |
Max.Torque(kn.M) |
400 |
Max. Lifting Capability(kn) |
300 |
Diameter of Power Unit(mm) |
350 |
Course of Power Unit(m) |
5 |
Pressure of Hydraulic System(Mpa) |
31.5 |
Slag Draining Mode |
Gaslift Counter Circulation |
Auxiliary Hoist(t) |
3 |
Total Power(kw) |
315 |
Overall Dimension(m) |
12×7.5×10 |
KT5000 Type fully hydraulic unit drilling machines is mainly composed of power unit, guide
1.Power Unit
Power unit is driven by four pumps and four motors, with the Max. rotating speed of 12r/min, and the Max. torque reaching 400kN.m. It can bear a lifting capacity of 300t and realize gas lifting counter-circulation construction. Special sealing ring is adopted in its inside. The seaking technique for shielding machine is appplied to the engineering drilling machine for the first time, solving the slurry leakage problem occurred in construction.
2.Guide
Four-pillar gate-tape structure is adopted for the guide
3.Chassis
Double layer chassis is adopted in the large-type engineering driling machine for the first time, with compact structure. The drilling bit with a diameter of 5m can go down when the upper chassis is moved away.
4.Drilling Tool System
The drilling tool system is composed of drilling bit, gas cell drilling rod, additional drilling rod, additional weight, centralizer, and standard drilling rod, with a diameter of the through hole of 350mm. Movable duct structure is adopted, therefor, the problem of the strength of the drilling rod is solved.
5.hydraulic System
Four-pump and four-motor constant power variable loop is adopted for the main loop and the driving power reaches 300kW. The hoisting loop is combined with the main loop to reduce the energy consumption. In addition, the cooling loop and automatic drilling loop are provided, which can great satisfy the construction requirements
6.Electrical System
All the actions of the drill are performed by the electrical buttons, greatly reducing the labor strength of the working personnel. PLC technology is adopted so that the torque, pressure and lifting weight of the drill can be timely abserved. Moreover, the application of remote control technique greatly facilitates the construction.
7.Operation Room
The large operting room is provided for the drilling machine, and all the electrical systems are arranged in it. The operating room is provided with air conditioners and the working environment of the operating personnel is improved.
At present, large bore drilling machines are mostly used in the engineering bridge piles in China, and its torque is below 300kN.m. With the consciousness rising of the invironmental protection and the growing increase of sewage treatment projects in the recent years, the existing big bore drilling machines can not satisfy the requirements. KT5000 Type fully hydraulic unit drilling machine developed by our company, with an output torque of 400kN.m and a drilling diameter of 5m, is the largest drilling machine of the same kind in China. It can meet not only the requirements of sewage treatment projects, but also those of the pile foundation construction of railways and highways
If you want to know more