PostYou are now at: Home » Products » Machinery » Cleaning Machine »

QH69 H beam shot blasting equipment

Click image to view original image
Brand: BINHAI
型号: QH69
Price: 60000.00USD/1
Min.Order: 1 1
Supply 500 1
Delivery: Shipment within 25 days since the date of payment
Address: China
Valid until: Never Expire
Updated on: 2017-06-02 14:13
Hits: 3166519
Buy
Company Detail
 
 
Details
 QH6912 H shaped steel of shot blast cleaning equipment

This series is a kind of roller shot-blasting machine. It mostly applies in the line of architecture, bridge, etc, which is used for relieving of stress and wiping surface rust of large girder shaped steel, H-shaped steel and other large dimension steels.
It is mainly applied to remove the stress and surface rust of large-sized or H-shaped steel structural components in the industries, like bridge, building, etc.

Main Technical Parameters of QH6912

QH6912 working principles and working procedures

When it works, dust collector, separator, elevator and screw delivery device are started, then start the blasting wheel, so the preparation is ready to work. First, load workpieces on feeding roller, wokieces will go into blasting room by roller’s convey. There is test device in front of inlet of blasting chamber, when the head of workpiece goes though, after calculation of PLC and finish delaying time, shot gate will open automatically, and begin to clean the workpieces. The workpieces will go ahead, meantime, they are cleaned by steel shot to remove the oxide skin, rust and sewage, until they leave the blasting room. When workpieces goes through the back assistant room, accumulated shots and dust on workpieces’ surface will be blew by high pressure blowpipe. When workpieces go into discharging roller, the cleaning work is finished for this time. When tail of workpieces go though testing, after calculation of PLC and finish delaying time, shot gate will close automatically. After the workpieces leave the blasting room completely, then unload workpieces on discharging roller. Repeat this process until the work is finished, then stop machine step by step.

Technical parameters

Item

QH698

QH6912

QH6915

QH6920

Effective cleaning width(mm)

800

1200

1500

2000

Room size body feed (mm)

1000*1700

1400*1700

1700*1700

2200*1800

Length of cleaning piece (mm)

1200-12000

1200-13000

1500-13000

2000-16000

Dimension of work piece (mm)

800*1600

1200*1500

1500*1500

2000*1800

Transmission speed(no load speed) (m/min)

0.5-4

0.5-4

0.5-4

0.5-4

Shot Volume(kg/min)

8*125

8*180

8*250

12*180

The first time the volume (kg)

4000

5000

5000

6000

Ventilation (m*m*m/h)

20000

22000

25000

30000

Total Power(without dust) (Kw)

90

130

180

180

Working process

1. start the dust collector

2. start the separator

3. start elevator

4. start transversal screw

5. start longitudinal screw

6. start conveyor system

7. start blasting wheel

8. load workpieces on feeding roller

9. workpieces go ahead and stop at the fixed position, then start shot gate

10. project steel shot, cleaning is beginning

11. after the workpieces finish cleaning, close the shot gate

12. unload workpieces on discharging roller

13. repeat steps of 8,9,10,11,12 steps

14. please turn to step 15 if you want to stop working

15. stop blasting wheel→stop longitudinal screw →stop transversal screw → elevator → separator →stop dust collector, whole machine stops working.