Purification engineering, clean room, clean room, P3 biological safety laboratory

Click image to view original image
Brand: blue
Price: 300.00USD/㎡
Min.Order: 300 ㎡
Supply
Delivery: Shipment within 30 days since the date of payment
Address: China
Valid until: 2106-02-07
Updated on: 2013-05-27 09:04
Hits: 7120471
Enquiry
Company Detail
 
 
Details

Cleaning principle

Airflow, initial purification efficiency, air conditioning, in the purification efficiency, air blower, pipeline, high purifying air, into the room to take the dust bacteria and other particles, return the shutters, primary purification repeat the above process, can achieve the purpose of purification.

Purification parameters

Number: 100000 = 15; 10000 level 20; 1000 ≥ 30 times. Pressure: the main workshop of the adjacent room ≥ 5Pa

The average wind speed: level 10, level 100 0.30.5m/s; winter temperature > 16 ℃; summer < 26 ± 2 ℃; fluctuation.

Temperature 45 - 65%; appropriate GMP powder workshop humidity at around 50%; electronic workshop humidity is slightly higher in order to avoid electrostatic.

Noise ≤ 65dB (A); supply of fresh air volume is the total air volume 10% - 30%; illumination 300LX...

Structural materials

1 purification plant wall, roof sheet more commonly used 50mm thick sandwich color steel plate manufacturing, which features beautiful, strong rigidity. The arc wall, door, window frame, generally adopts a special aluminum profiles manufacturing.

2 the ground can be used epoxy Ping floor or advanced wear-resistant plastic flooring, anti-static requirements, can choose the anti-static type.

The 3 air supply and return pipeline with hot galvanized plate made of paste, purifying flame retardant PF foam plastic insulation effect is good.

4 HEPA with stainless steel frame, beautiful and clean, piercing screen with the baking sheet, no rust is not sticky, appropriate cleaning.

Purification system:

1, clean dust-free workshop, by the central air-conditioning and air purification system, is also the heart of purification system. Control purification workshop air dust particles, adjusting the workshop temperature and the temperature.

2, the locker room, air shower, clean room is composed of three basic parts plant purification system. Air shower room is clean division import channel, with high-velocity clean airflow sprayed, effective rapid removal of dust and bacteria in the human body. Sandwich color steel plate isolation space or walls using clean room, the upper steel ceiling, floor with epoxy resin paved using range:

Mainly for clean plant pharmaceutical, food, various laboratories, electronic factory, all levels of hospital operation room, cosmetics factory, animal houses and precision instruments clean room engineering design, installation and maintenance service. Purification equipment are clean bench, cleaner, high efficiency filter, ventilation cabinet, biological safety cabinet, air shower room and clean the transfer window. Another provision of laboratory equipment and water treatment system. Our company and the national electronic, pharmaceutical industry has a broad and friendly relations of cooperation, to provide sandwich color steel plate quality for many users (polystyrene, rock wool, honeycomb, gypsum board and other core material), excellent purifying air conditioning equipment, the design and construction of the company many cleaning air conditioning engineering are praised by users, the do the inspection department engineering are the State Administration of traditional Chinese medicine, China State Construction Engineering Quality Supervision and inspection center, China Institute of metrology. The company to the science and technology as the forerunner, take the quality as the life, to customer needs as the basis, we wholeheartedly will provide the high quality product and the service for you!

Total: 0 [Show All]  Related Reviews
 
More »Our Others Products

[ ProductsSearch ]  [ Add To Favourite ]  [ Tell Friends ]  [ Print Content ]  [ Violation Report ]  [ Close Window ]